WSAR NEWS

MassDOT Work in Fall River

MassDOT Advisory: Fall River
 
Guardrail Repair Operations on Ramp from Broadway (Route 138) and Milliken Boulevard to I-195 Eastbound
 
Work will occur on Wednesday, January 26, from 10 a.m. to 2 p.m.
 
A temporary detour will be in place
 
 
FALL RIVER - The Massachusetts Department of Transportation (MassDOT) is announcing it will be conducting daytime guardrail repair operations on the ramp from Broadway (Route 138) and Milliken Boulevard to I-195 eastbound in Fall River.  The work is scheduled to take place on Wednesday, January 26, from 10:00 a.m. to 2:00 p.m.
 
A temporary detour will be in place during the guardrail operations as follows:
 
•    Traffic from Broadway southbound (Route 138) will continue on Broadway and take a left onto Columbia Street at the light. Columbia Street will turn to Rodman Street and traffic will continue straight to the intersection with Plymouth Avenue (Route 81).  Take a left at the traffic signal onto Plymouth Avenue and then take the first right to the on-ramp to I-195 eastbound.
 
•    Traffic from Milliken Boulevard southbound will be directed to take a left turn onto Columbia Street and follow the same directions as listed above. 
 
 

Facebook