WSAR NEWS

The Weaver Street Detours

MassDOT Advisory: Fall River

Weaver Street Bridge Closed for Demolition and Reconstruction Operations beginning on Wednesday, November 10 
 
Construction anticipated to continue through 2023 and detour will be in place

  
FALL RIVER – The Massachusetts Department of Transportation (MassDOT) is announcing it will be closing the Weaver Street Bridge located over the railroad in Fall River. The closure will begin at 7:00 a.m. on Wednesday, November 10, and is anticipated to continue through 2023. The closure is necessary to allow crews to safely and effectively demolish and reconstruct the bridge.  

Traffic and pedestrians will be detoured as follows during the bridge closure: 

Traffic and pedestrians coming from the east side of the bridge:
•    Traffic will be directed along North Main Street. 
•    Take a right onto Cove Street. 
•    Take a right onto Ace Street. 
•    Take a left onto Probber Lane. 
•    Take a right onto West Street. 
•    Take a right back onto Weaver Street. 

Traffic and pedestrians coming from the west side of the bridge:
•    Traffic will be directed along Weaver Street.
•    Take a left onto Probber Lane. 
•    Take a left onto West Street. 
•    Take a right onto Ace Street. 
•    Take a left onto Cove Street. 
•    Take a left onto North Main Street. 
 

Facebook